See how you can be another RPS Projects success story, Call us now

The $14 million redevelopment of the Warragul Leisure Centre was Baw Baw Shire Council’s largest capital works project, with works being undertaken by Builder: Behmer & Wright Pty Ltd.

NEW FEATURES

The redevelopment of the Warragul Leisure Centre is set to provide the residents of Baw Baw Shire and adjoining communities with a higher standard community facility, and include:

  • Extended pool hall for more aquatic space
  • A new leisure and splash pool with beach entry and water features
  • Larger warm water pool with an accessible ramp
  • A new 50m outdoor pool
  • New accessible ramp within 25m pool
  • Upgraded changeroom facilities

Residents are set to have a range of new aquatic facilities when the Warragul Leisure Centre redevelopment is completed.

Following a 17 month redevelopment, the leisure centre redevelopment and new outdoor pool is in the final stages of completion.

Warragul Aquatic & Leisure Complex RPS Projects scope including site preparation, drainage, design and installation, all pipe laying and hydraulic and fire service.